From the fall of 2011 through the end of spring 2012, the James R. Macdonald Lab has been remodeling. Our various laser-atom studies have displaced some of our old particle accelerators, and have grown beyond the space we originally allotted for them.
Thursday, 10 May, saw the duct work continue and a marked acceleration of electrical wiring. Lighting, outlet boxes and switch boxes all appeared and sprouted multi-colored wiring.
Each thumbnail below links to a much larger image about 930 kB in size.
Return to the Photo Gallery index.