From the fall of 2011 through the end of spring 2012, the James R. Macdonald Lab has been remodeling. Our various laser-atom studies have displaced some of our old particle accelerators, and have grown beyond the space we originally allotted for them.
Wednesday, 16 May 2012, and details are being tended to. Fire alarms were wired in, more ceiling tiles installed and sundry cover plates affixed. The network guys are back in the lab, and cable trays now reach out into the Tandem bay.
Each thumbnail below links to a much larger image about 930 kB in size.
Return to the Photo Gallery index.