From the fall of 2011 through the end of spring 2012, the James R. Macdonald Lab has been remodeling. Our various laser-atom studies have displaced some of our old particle accelerators, and have grown beyond the space we originally allotted for them.
Tuesday, 22 May 2012 saw a walkthrough with the contractors and a variety of tests to the air flow, fire alarm and other systems. Cleaning is wrapping up, and we now need to wear our booties to go inside.
Each thumbnail below links to a much larger image about 930 kB in size.
Return to the Photo Gallery index.