Pretty much everything, everywhere at K-State and in Manhattan was under construction during the Summer of 2018. This gallery shows the reconstruction of the parking lot west of Cardwell Hall. Impressive regrading and drainage work was finally finished just in time to pave before the students came back.
Each thumbnail below links to a much larger image about 3.9 MB in size.
Return to the Photo Gallery index.